If an item has been modified, a load test may be performed as verification of a lifting device’s capacity. Our load testing procedure consists of four segments: The pre-inspection, load test, post inspection and Engineer’s report.
Our Technician will perform the pre-inspection to insure your equipment is capable of lifting the load without failure. If the equipment is deemed “certified”, the Technician will perform the load test. After the load is released, the lifting device is thoroughly inspected, for deformation, cracks or other defects, utilizing magnetic particle inspection. A load test report is prepared, signed and stamped by our Engineer.